Smiths Medical Level 1 700 Series Substitute Esophageal Stethoscope 18 fr, Temperature Sensor, Heat Bonded Cuff, Long Lead Wires, Insulated Sensor Cap - ES70S-18

Out of stock
Sold out
$156.99
SKU ES70S-18
Spring Savings: Use code FALL for 5% OFF Total Purchase
Free Shipping Orders Over $100
Fast Shipping
Easy Tracking
Safe & Secure
Checkout

Questions? Speak with a specialist!

Chat with us!
Click Widget Below
Give us a call!
+1(646)701-0070
This item requires 3-5 Business Days to process and prepare for shipping.
Description
  • Smiths Medical Level 1 disposable Esophageal Stethoscope Temperature Sensors are placed into the esophagus to provide accurate measurement of a patients core body temperature and transmit heart and lung sounds to the anesthesiologists earpiece
  • Exceptional sound quality
  • Smooth, heat-bonded cuff to tube transition minimizes potential for esophageal irritation
  • Long lead wires ensure that the connection to cable is away from patients face
  • Insulated sensor cap decreases risk of patient shock or burn during electrocautery, available in adult and pediatric sizes
  • WARNING: Cancer and Reproductive Harm - www.P65Warnings.ca.gov
Stock # : 192377
Manufacturer # : ES70S-18
Brand : Level 1 700 Series Substitute
Manufacturer : Smiths Medical
Application : Esophageal Stethoscope
Specifications : 18 fr, Temperature Sensor, Heat Bonded Cuff, Long Lead Wires, Insulated Sensor Cap
UNSPSC Code : 42182209

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)

You recently viewed

Clear recently viewed